Home > Ikenberry Commons Construction > Photo Gallery
Glass reflects the sunset. (November 4, 2009)
Pendant lights glow within the SDRP on a fall evening. (November 4, 2009)
More interior progress. (October 29, 2009)
Kitchen equipment arrives weekly and continues to be installed. (October 29, 2009)
Finishing touches being completed inside the SDRP. (October 29, 2009)
Pendant lights inside the SDRP. (October 29, 2009)
Close-up view of the newly installed ceiling tiles and painted interior. (September 16, 2009)
Ceiling tile and fresh paint make the new building look more polished every day. (September 16, 2009)
Ceramic tile and kitchen equipment being installed. (September 16, 2009)
Construction progress, south entry of the SDRP. (September 2, 2009)
Pizza ovens in Ikenberry Dining Hall. (September 2, 2009)
Inside Ikenberry Dining Hall (September 2, 2009)
Many of the new concrete sidewalks have been finished, and the work will continue into fall. (August 10, 2009)
View from Euclid Street. (August 10, 2009)
Boulders being assembled for the landscape. (August 10, 2009)
Boulders, which were shipped from Missouri, will be used for landscaping. (July 22, 2009)
Boulders and gravel at the south entry. The gravel will be applied as a base for the new sidewalks. (July 22, 2009)
New sidewalk along Gregory Drive, the north side of the new building. (July 22, 2009)
New sidewalk on the east side of the dining and programs building, along Euclid Street. (July 22, 2009)
Workers marking off joints to be cut in the new walkway along the dining building. (July 14, 2009)
View of the dining building and new residence hall along Gregory Drive. (July 14, 2009)
The main canopy of the dining building on the Gregory Drive side. (July 14, 2009)
Inside the serving area: a hood and pizza ovens. (July 14, 2009)
Newly installed ceiling grid, first floor of the main dining room. (July 14, 2009)
Two-story space on the south side of the dining building, taken from the top of the straight monumental staircase. (July 14, 2009)
Inside the main entry doors on the south side of Ikenberry Dining Hall. The reception/greeting area will be on the right, behind the red lift. (June 24, 2009)
The second-floor dining area, behind the red curving wall, will overlook the first-floor dining space. (June 24, 2009)
The second floor of the dining area. (June 24, 2009)
Second-floor student room in the new residence hall. This is one of two configuration types. (June 24, 2009)
The curved side of the new dining hall, looking west. (June 9, 2009)
View of the main entry canopy of the new dining hall building and residence hall, as seen from Gregory Drive. (June 9, 2009)
Curved roof and glass on the west side of the main dining room. (June 9, 2009)
Two-story-high entry space and monumental staircase. (June 9, 2009)
Two-story-high glass façade on the east side of the dining building, reflecting Clark Hall in the glass. (May 19, 2009)
Construction progress: May 19, 2009
Ceiling and clerestory in two-story-high curved space of the main dining hall. (May 19, 2009)
At home at Illinois
Connect. Learn. Achieve. Student Affairs at Illinois